In the transformer procurement, bidding and project inquiry work, many buyers, engineers and EPC enterprises, often faced with quotation deviation, program repeatedly modified, delivery schedule is not accurate and other problems. The root of the problem, most of the problems are due to the preliminary docking to provide technical parameters, project information is not complete, not standardized enough, resulting in manufacturers can not accurately match the design and production program.
Transformers are highly customized core power equipment, the parameters directly determine the equipment materials, structural design, process solutions, production costs and delivery cycle. The more detailed the parameters provided, the more comprehensive the information, the more accurate the manufacturer's offer, cost-effective and more in line with the project requirements, but also from the source to avoid parameter inconsistency, specification redundancy, the site can not be installed, later rectification and rework and other hidden dangers. Based on this, this article will disassemble the full set of information and parameters required for accurate transformer quotes, covering the basic specifications, core winding configuration, cooling and installation conditions, certification standards, optional accessories and project delivery requirements, to help industry users to efficiently complete the inquiry docking.